Perancangan Pemilihan Lokasi Gudang Pendukung Dalam Pengelolaan Material Pemeliharaan Pembangkit Listrik Tersebar Berdasarkan Analytic Hierarchy Process Dan Goal Programming
(Studi Kasus : PT. PLN Nusantara Power Up Pandan)
DOI:
https://doi.org/10.55826/jtmit.v5i3.2121Keywords:
Pengambilan Keputusan Multi Kriteria, Pembangkit Listrik Tenaga Air, Analytic Hierarchy Process, Goal Programming, Sensitivity Analysis, GudangAbstract
PT PLN Nusantara Power’s Pandan Generation Unit (UP Pandan) manages various Hydropower Plants (PLTA) and Mini-Hydropower Plants (PLTMH) distributed across ten regencies in North Sumatra Province. Ensuring the availability of spare parts for maintenance activities is crucial for maintaining the continuity of the electrical system. However, the dispersed nature of these power plants presents challenges regarding distribution distances, travel risks, transit times, and logistics costs. These complexities are compounded by a storage structure split between a central warehouse and stock points at individual generation units. Establishing a sub-warehouse offers a potential solution to minimize distance, time, risk, and cost through strategic location selection. This study aims to determine the optimal sub-warehouse location by evaluating criteria such as distance, travel time, transportation costs, and risk, utilizing the Analytic Hierarchy Process (AHP) and Goal Programming (GP) methods. AHP results indicate that risk is the highest-priority criterion (0.67427 or 67.43%), followed by distance from the central warehouse (0.12602 or 12.60%), transportation costs (0.12099 or 12.10%), and travel time (0.07871 or 7.87%). These weights were subsequently integrated into a GP model to evaluate three potential locations. The optimization results identified the Renun Hydropower Plant (X₂) as the best location for the sub-warehouse. Sensitivity analysis, involving a ±20% variation in risk weights, confirmed that the results remained consistent and feasible. Consequently, the Renun Hydropower Plant can effectively support the central warehouse in distributing spare parts to the dispersed power plants, thereby enhancing the reliability of maintenance and operational services across all managed generation units.
References
[1] PT. PLN (PERSERO), Manual Book Pembangkit & Harian Deklarasi Kesiapan Pembangkit PLN. 2026.
[2] Sunil. Chopra and Peter. Meindl, Supply chain management : strategy, planning, and operation. Pearson, 2016.
[3] F. E. Achamrah, F. Riane, and S. Limbourg, “Spare parts inventory routing problem with transshipment and substitutions under stochastic demands,” Appl. Math. Model., vol. 101, pp. 309–331, Jan. 2022, doi: 10.1016/j.apm.2021.08.029.
[4] G. P. Bhole, “Multi Criteria Decision Making (MCDM) Methods and its applications,” Int. J. Res. Appl. Sci. Eng. Technol., vol. 6, no. 5, pp. 899–915, May 2018, doi: 10.22214/ijraset.2018.5145.
[5] M. G. Bayrakcı and Ö. F. Baykoç, “An integrated modelling approach for an optimal location of warehouses in the defence industry organisation,” Operations Research and Decisions, vol. 33, no. 2, pp. 35–52, 2023, doi: 10.37190/ord230203.
[6] Z. Drezner and G. O. Wesolowsky, “Network design: selection and design of links and facility location,” Transp. Res. Part A Policy Pract., vol. 37, no. 3, pp. 241–256, Mar. 2003, doi: 10.1016/S0965-8564(02)00014-9.
[7] T. He, W. Ho, C. L. K. Man, and X. Xu, “A fuzzy AHP based integer linear programming model for the multi-criteria transshipment problem,” International Journal of Logistics Management, vol. 23, no. 1, pp. 159–179, 2012, doi: 10.1108/09574091211226975.
[8] I. Contreras and E. Fernández, “General network design: A unified view of combined location and network design problems,” Eur. J. Oper. Res., vol. 219, no. 3, pp. 680–697, Jun. 2012, doi: 10.1016/j.ejor.2011.11.009.
[9] M. Mohammadi, R. Tavakkoli-Moghaddam, A. Siadat, and J. Y. Dantan, “Design of a reliable logistics network with hub disruption under uncertainty,” Appl. Math. Model., vol. 40, no. 9–10, pp. 5621–5642, May 2016, doi: 10.1016/j.apm.2016.01.011.
[10] P. Kailomsom and C. Khompatraporn, “A Multi-Objective Optimization Model for Multi-Facility Decisions of Infectious Waste Transshipment and Disposal,” Sustainability (Switzerland) , vol. 15, no. 6, Mar. 2023, doi: 10.3390/su15064808.
[11] N. Yesilcayir, G. Ayvazoglu, S. Celik, and I. Peker, “Transit warehouse location selection by IF AHP- TOPSIS integrated methods for disaster logistics: A case study of Turkey,” Research in Transportation Business and Management, vol. 57, Dec. 2024, doi: 10.1016/j.rtbm.2024.101232.
[12] M. Hamurcu, “Transportation planning with analytic hierarchy process and goal programming,” 2018.
[13] I. Putu, A. Putra Wiguna, I. Made, and M. Sudiartha, “Determination of Optimal Warehouse Location at PT. Sumber Alfaria TrijayaTbk (Bali Branch).” [Online]. Available: www.ajhssr.com
[14] S. Çıkmak, B. Kantoğlu, and G. Kırbaç, “Evaluation of the effects of blockchain technology characteristics on SCOR model supply chain performance measurement attributes using an integrated fuzzy MCDM methodology,” International Journal of Logistics Research and Applications, vol. 27, no. 6, pp. 1015–1045, 2024, doi: 10.1080/13675567.2023.2193736.
[15] R. R. Shrestha et al., “APPLICATION OF AHP AND GIS FOR OPTIMAL SOLAR SITE IDENTIFICATION IN MADHESH PROVINCE, NEPAL,” International Journal of the Analytic Hierarchy Process, vol. 14, no. 3, 2022, doi: 10.13033/ijahp.v14i3.986.
[16] D. K. Sharma and R. K. Jana, “A hybrid genetic algorithm model for transshipment management decisions,” Int. J. Prod. Econ., vol. 122, no. 2, pp. 703–713, Dec. 2009, doi: 10.1016/j.ijpe.2009.06.036.
[17] M. Tavana, A. Shaabani, S. Mansouri Mohammadabadi, and N. Varzgani, “An integrated fuzzy AHP- fuzzy MULTIMOORA model for supply chain risk-benefit assessment and supplier selection,” International Journal of Systems Science: Operations and Logistics, vol. 8, no. 3, pp. 238–261, 2021, doi: 10.1080/23302674.2020.1737754.
[18] K. Mukherjee and A. Bera, “Application of goal programming in project selection decision — A case study from the Indian coal mining industry,” Eur. J. Oper. Res., vol. 82, no. 1, pp. 18–25, Apr. 1995, doi: 10.1016/0377-2217(94)00197-K.
[19] N. K. Kwak, C. W. Lee, and J. H. Kim, “An MCDM model for media selection in the dual consumer/industrial market,” Eur. J. Oper. Res., vol. 166, no. 1, pp. 255–265, Oct. 2005, doi: 10.1016/J.EJOR.2004.02.016.
[20] A. Ö. Dengiz, K. D. Atalay, and F. Altıparmak, “A goal programming approach for multi objective, multi-trips and time window routing problem in home health care service,” Journal of the Faculty of Engineering and Architecture of Gazi University, vol. 36, no. 4, pp. 2167–2181, 2021, doi: 10.17341/gazimmfd.853882.
[21] C. N. Liao and H. P. Kao, “Supplier selection model using Taguchi loss function, analytical hierarchy process and multi-choice goal programming,” Comput. Ind. Eng., vol. 58, no. 4, pp. 571–577, May 2010, doi: 10.1016/j.cie.2009.12.004.
[22] N. Dini, S. Yaghoubi, and H. Bahrami, “Route selection of periodic multimodal transport for logistics company: An optimisation approach,” Research in Transportation Business and Management, vol. 54, Jun. 2024, doi: 10.1016/j.rtbm.2024.101123.
[23] U. Ciptomulyono, “Pengambilan Keputusan Multi Kriteria,” Surabaya, Aug. 2024.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Erwan Aprianto, Udisubakti Ciptomulyono

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.