Analysis of Production Machine Effectiveness in Line A Using OEE and Six Big Losses Method

Authors

  • Muhammad Iqbal Gymnastiar Universitas Dian Nuswantoro
  • Ridwan Hartono Universitas Dian Nuswantoro

DOI:

https://doi.org/10.55826/jtmit.v4i3.988

Keywords:

Equipment Failure Losses, Overall Equipment Effectiveness, Six Big Losses

Abstract

The operational effectiveness of production machines is crucial in maintaining the smoothness and efficiency of manufacturing processes. This research aims to analyze the effectiveness of the production system on Line A at PT XYZ using the Overall Equipment Effectiveness (OEE) method and the Six Big Losses approach, and identify the dominant factors causing equipment failure losses. Data was collected from January to May 2024, covering quantitative analysis of availability, performance, and quality values. The results show that the average OEE value is 82.58%, which is still below the world-class standard of 85%. Of the total loss time of 20,367 minutes, the highest losses came from equipment failure losses at 38.25%, reduced speed losses (23.58%), and idling and minor stoppage losses (14.36%). These findings indicate that technical machine disruptions are the leading cause of the decline in production effectiveness. Therefore, improvement strategies need to focus on strengthening preventive and predictive maintenance systems, enhancing technician competency, and optimizing the reporting and handling of disruptions to improve the efficiency and reliability of the production system sustainably.

References

M.Wolska, T.Gorewoda, M.Roszak, andL.Gajda, “Implementation and Improvement of the Total Productive Maintenance Concept in an Organization,” Encyclopedia, vol. 3, no. 4, pp. 1537–1564, 2023, doi: 10.3390/encyclopedia3040110.

E. T.Prasetio andA.Oktora, “Evaluation of The Effectiveness of Die Casting Machines Using Overall Equipment Effectiveness (OEE),” J. Teknol. dan Manaj., vol. 22, no. 1, pp. 99–106, 2024, doi: 10.52330/jtm.v22i1.239.

M.Rusman, S. M.Parenreng, I.Setiawan, S.Asmal, andI.Wahid, “The Overall Equipment Effectiveness (OEE) analysis in minimizing the Six Big Losses: An effort to green manufacturing in a wood processing company,” IOP Conf. Ser. Earth Environ. Sci., vol. 343, no. 1, 2019, doi: 10.1088/1755-1315/343/1/012010.

L. F.Rahmawati andB.Yusuf, “Perbandingan Nilai OEE dan Efektivitas Aktual dalam Proses Produksi,” J. Ilm. Tek. Ind., vol. 20, no. 1, pp. 45–52, 2024.

F. R.Sari, I.Hamdala, and S.Widiyawati, “Evaluasi Kinerja Mesin Produksi Menggunakan Pendekatan Efektivitas Operasional Dan Strategi Total Productive Maintenance,” vol. 03, no. 01, pp. 11–19, 2025.

I.Roda and M.Macchi, “Factory-level performance evaluation of buffered multi-state production systems,” J. Manuf. Syst., vol. 50, pp. 226–235, 2019.

M.Ardiansyah, “Analisis Six Big Losses sebagai Upaya Peningkatan Efektivitas Produksi,” J. Optimasi Sist. Ind., vol. 16, no. 3, pp. 134–142, 2023.

O. C.Chikwendu, A. S.Chima, and M. C.Edith, “The optimization of overall equipment effectiveness factors in a pharmaceutical company,” Heliyon, vol. 6, no. 4, 2020.

B.Santoso, E.Handoko, andS.Widodo, “Implementasi Metode OEE dan Six Big Losses pada Produksi Komponen Otomotif,” J. Tek. Ind. dan Sist., vol. 5, no. 2, pp. 78–86, 2023.

R. Hidayat and M.Ramadhan, “Identifikasi Losses Dominan pada Lini Produksi Menggunakan Six Big Losses dan OEE,” J. Ris. Dan Teknol. Ind., vol. 14, no. 1, pp. 23–31, 2024.

I. A.Putri andY. A.Nugraha, “Root Cause Analysis sebagai Pendekatan Strategis Peningkatan OEE,” J. Inov. Manufaktur, vol. 9, no. 1, pp. 17–25, 2023.

A.Tayal, N. S.Kalsi, M. K.Gupta, D. Y.Pimenov, M.Sarikaya, and C. I.Pruncu, “Effectiveness improvement in manufacturing industry; trilogy study and open innovation dynamics,” J. Open Innov. Technol. Mark. Complex, vol. 7, no. 1, 2021.

P.Dobra, “Assembly Line Overall Equipment Effectiveness (OEE) Prediction from Human Estimation to Supervised Machine Learning,” J. Manuf. Mater. Process., vol. 6, no. 3, 2022, doi: 10.3390/jmmp6030059.

I.Doyer, “As easy as OEE: enabling productivity improvement in schools by using overall equipment effectiveness as a framework for classroom data analysis,” Int. J. Lean Six Sigma, vol. 14, no. 5, pp. 1055–1074, 2023, doi: 10.1108/IJLSS-03-2022-0057.

A. Mitsel, “Assessment of overall equipment effectiveness according to OEE methodology,” Journal of Physics: Conference Series, vol. 1889, no. 4. 2021. doi: 10.1088/1742-6596/1889/4/042002.

S. D.Luozzo, “On the relationship between human factor and overall equipment effectiveness (OEE): An analysis through the adoption of analytic hierarchy process and ISO 22400,” Int. J. Eng. Bus. Manag., vol. 15, 2023, doi: 10.1177/18479790231188548.

A.Rizzo et al., “The critical raw materials in cutting tools for machining applications: A review,” Materials (Basel), vol. 13, no. 6, p. 1377, 2020.

M. R. B. A.Masuri, “Assessment of piling machine operation performance using overall equipment effectiveness (OEE) during piling construction at Universiti Teknologi Malaysia, Melaka,” Lecture Notes in Mechanical Engineering. pp. 172–182, 2021. doi: 10.1007/978-981-15-7309-5_18.

D. A.Kifta, “Analysis and Measurement of Overall Equipment Effectiveness (OEE) Values of the CNC Cutting Machine at PT. XYZ,” 2021 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2021. pp. 953–958, 2021. doi: 10.1109/IEEM50564.2021.9672603.

T.Haddad, “Improving Overall Equipment Effectiveness (OEE) of Extrusion Machine Using Lean Manufacturing Approach,” Manuf. Technol., vol. 21, no. 1, pp. 56–64, 2021, doi: 10.21062/mft.. 2021.006.

P.Dobra, “Cumulative and Rolling Horizon Prediction of Overall Equipment Effectiveness (OEE) with Machine Learning,” Big Data Cogn. Comput., vol. 7, no. 3, 2023, doi: 10.3390/bdcc7030138.

T.Dziubak, “Experimental Dust Absorption Study in Automotive Engine Inlet Air Filter Materials,” Materials (Basel), vol. 17, no. 13, p. 3249, 2024.

Downloads

Published

22-07-2025

How to Cite

[1]
Muhammad Iqbal Gymnastiar and Ridwan Hartono, “Analysis of Production Machine Effectiveness in Line A Using OEE and Six Big Losses Method”, JTMIT, vol. 4, no. 3, pp. 747–756, Jul. 2025.