[1]
“Evaluasi Proyek Overhaul Turbin Gas dengan Metode CPM, PERT, SMED, dan Monte Carlo”, JTMIT, vol. 5, no. 3, pp. 1230–1236, Jul. 2026, doi: 10.55826/jtmit.v5i3.1965.