[1]
“Analisis Overall Equipment Effectiveness (OEE) dan Six Big Losses pada Mesin Coiling di Proses Produksi Coil Spring Plant 3A: (Studi Kasus: PT Indospring Tbk )”, JTMIT, vol. 4, no. 4, pp. 2194–2202, Dec. 2025, doi: 10.55826/jtmit.v4i4.1401.